Skip to main content
FREE Delivery!|(401) 210-4557

Dirt calculator for Rhode Island

Estimate fill dirt by cubic yards or tons for grading, depressions, and excavations, including room for settlement.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

Fill dirt can settle 10 to 15% after placement. Ordering only the measured hole volume can leave the surface an inch or two low after heavy rain, so this calculator leaves its 10% settling allowance selected. Dry fill dirt is about 2,400 lb per cubic yard, or 1.2 tons, and it is sold by the yard. Use topsoil for areas that will grow plants; use the separate topsoil calculator for that material.

How to measure a fill area

  1. For a rectangular area, multiply the feet of length by the feet of width and use the mean fill depth. On an irregular low area, note the deep end and the thin edge, then calculate from the midpoint.
  2. For a trench or excavation, multiply its length, width, and void depth, using feet for all measurements.
  3. Convert cubic feet to yards by dividing by 27, or to tons by multiplying by 1.2. Keep the settlement allowance enabled.
Cubic yards = (Area sq ft × Average depth in ÷ 12) ÷ 27
Tons = cubic yards × 1.2 · +10% for settling is on by default

Coverage and weight

MaterialWeight per cubic yardTons per yard
Fill dirt (dry)≈ 2,400 lb1.20
Fill dirt (wet)up to 3,000 lb1.50
Topsoil, for comparison≈ 2,200 lb1.10
Depth of fill1 cubic yard covers5 yards cover
2 inches162 sq ft810 sq ft
4 inches81 sq ft405 sq ft
6 inches54 sq ft270 sq ft
12 inches27 sq ft135 sq ft

Typical fill jobs and yard amounts

ProjectTypical sizeDepthVolumeWeight
Raise a low lawn area20 x 20 ft4"4.9 yd³5.9 tons
Level a settled depression15 x 15 ft, avg 6"6"4.2 yd³5 tons
Backfill a utility trench25 ft x 2 ft18"2.8 yd³3.3 tons
Build a landscape berm20 x 6 ft12"4.4 yd³5.3 tons
Backfill along a foundation60 ft x 2 ft10"3.7 yd³4.4 tons

Fill dirt uses and limits

Fill dirt is mineral subsoil from beneath the active topsoil, with rock and debris screened out. It contains little organic matter, which helps structural fill stay level as material settles. Use it for filling holes, trench backfill, berms, and grade changes. Areas for grass or vegetables need 4 to 6 inches of topsoil over the fill rather than topsoil throughout the structural layer.

Plan for settlement before ordering

Fill often settles enough that the same excavation needs another load. Place it in 6-8 inch lifts and compact every lift. If compaction equipment is unavailable, soak each lift well and give it time to consolidate. For lawn work, finish about a half-inch above grade so it settles level. Fill below slabs or footings needs thinner lifts, equipment, and an engineer's compaction specification. Do not bury organic debris in fill. Wood can decay underground and leave a sinkhole after a five-year delay.

How wet weather affects fill orders

Rain changes fill weight, not the volume needed for an order. It can change the work schedule. Wet fill smears instead of compacting, and moving it by wheelbarrow gets difficult, so plan delivery for dry weather. A pile set high sheds much of the rain; cover it when storms approach to get spreading sooner.

Fill dirt answers for project planning

How many yards of dirt are needed?
Start with the square-foot area, multiply by the average depth in feet, and divide by 27. For a 20 x 10 space raised 6 inches, the result is 3.7 cubic yards. Include 10% for settling and order 4.
What is the weight of a yard of fill dirt?
A dry yard weighs about 2,400 lb, or 1.2 tons. Rain can push that same volume past 3,000 lb, a bigger concern for wheelbarrow loads than for the order size.
What does fill dirt mean?
This is screened subsoil with minimal organic material. It packs down firmly for raising grades, but it does not provide a suitable growing medium.
How does fill dirt differ from topsoil?
Fill dirt forms the structural layer, while topsoil supports growth. Bring the fill within 4 to 6 inches of final grade, then apply topsoil in planting areas. This keeps the two materials in their intended roles.
How much fill is needed for a hole?
Multiply the length, width, and depth in feet, then divide by 27. A 4 x 4 ft excavation at 3 feet deep equals 48 cubic feet, or roughly 1.8 yards. Add fill in compacted layers; the 10% allowance handles settlement.
Where do I get fill dirt?
Use the calculator link to reach the Fill Dirt product page. Fill dirt is sold by the yard, with free delivery across Rhode Island. "Free fill" from classified ads is often uneven and unscreened, and may leave debris behind for you to remove.
How many yards fit in a dump truck?
A single-axle truck carries 8-10 yards, while a tandem carries 12-16. A full truck is not required for an order, and delivery is free at any quantity.
Is compaction needed for fill dirt?
Yes for areas supporting weight. Install it in 6-8 inch lifts and compact them. For lawn repairs, soak the fill and leave a half-inch above the final grade to settle level without equipment.

Low-cost material by the yard, delivered free to your gate.

Fill dirt for grading and backfill, screened and delivered across Rhode Island.

Shop Fill Dirt

Buy material sized for your project